Skip to content

Fixed-price compliance for your strata · British Columbia

EV Ready Plans · Fraser Valley

EV Ready Plan Rebates for FortisBC Customers, and the Local Top-Ups Worth Checking: A Guide for Fraser Valley Strata Councils

The rules are the same across British Columbia — but your deadline and building stock are local. Here is ev ready plan rebates for fortisbc customers, and the local top-ups worth checking, written for Fraser Valley strata councils.

6 min read

← Read the full guide · All articles

What this means for Fraser Valley strata councils

This guide covers ev ready plan rebates for fortisbc customers, and the local top-ups worth checking for strata corporations across Fraser Valley. The requirements are province-wide, but two things are local to your council — the deadline you are working toward and the kind of building you manage.

The Fraser Valley Regional District covers Abbotsford, Chilliwack, Mission, Hope, and the surrounding rural communities. Strata stock here is townhouse-dominant with low-rise wood-frame condo developments through the urban cores, plus growing mid-rise concrete development around Highstreet and central Abbotsford.

  • Electrical Planning Report (EPR): due December 31, 2026 for Fraser Valley stratas of five or more lots, under the Strata Property Act.

The full guide

Last updated: September 21, 2026

If your strata's electricity comes from FortisBC rather than BC Hydro, you can still claim the EV Ready Plan rebate. The amount is the same. The application is different: it goes to FortisBC, and it works by email rather than through BC Hydro's online form. Some cities also add their own top-up to the provincial rebate, which is worth a few minutes to check before your council signs anything.

Key facts — EV Ready Plan rebates for FortisBC customers

  • One program, two administrators. The rebate comes from the Province's CleanBC Go Electric Home and Workplace Charging Program. BC Hydro and FortisBC both run it from the same Program Guide, and your electricity utility decides which one handles your file.
  • The amount does not change. Up to 75% of the cost of the plan, to a maximum of $3,000 per building, one funded plan per building.
  • The process does. FortisBC customers apply through FortisBC (fortisbc.com/ev), and the file is built around the FortisBC account number.
  • A city top-up may add up to $1,000 in Kelowna, Kamloops, Saanich and Squamish, and Nanaimo runs a similar program of its own.
  • Pre-approval comes first, whichever utility you use. Costs incurred before pre-approval are not eligible.

Which utility administers your rebate?

The Program Guide sorts applicants by the electricity account on the building:

Your building's electricity account is with You apply to
BC Hydro, or the City of New Westminster BC Hydro
FortisBC, or the City of Penticton, City of Grand Forks, Nelson Hydro or District of Summerland FortisBC

The quickest way to tell is the bill for the common areas. If it is a FortisBC bill, the account number is at the top left of the first page, and that is the number the rebate file uses. Kelowna and much of the Southern Interior are served by FortisBC, as is much of the Kootenays.

What is the same

Every rule that decides whether a building qualifies is the same for both utilities:

  • A BC apartment, condominium or townhome complex of five or more units.
  • Shared electrical infrastructure.
  • Built no later than August 31, 2022, with dedicated off-street parking for residents. Long-term residents only; short-term rentals do not qualify.
  • A plan prepared by a qualified professional, with one recommended solution that provides an EV Ready parking stall for every residential unit (or for every parking stall, where there are fewer stalls than homes; visitor parking is excluded).
  • A final application within nine months of the pre-approval email. Extensions are considered if requested before the deadline.

An EV Ready Plan also opens the door to the other rebates. The infrastructure rebate covers up to 50% of eligible installation costs, to $600 per stall. The charger rebate covers 50% of eligible costs, to $1,400 per charger in an EV Ready building. Since July 15, 2026, a plan (or an Electrical Planning Report) is also required before a strata can claim the standalone charger rebate. Our guide to the July 2026 rebate changes covers that in full.

What is different for FortisBC customers

1. Pre-approval is by email. FortisBC asks for pre-approval by email to [email protected], with:

  • the strata's legal name and address;
  • the full name, title and contact details of the person authorized to act for the strata;
  • a copy of the accepted quote for the plan;
  • the signed consent forms that apply: the Contractor Participant Consent Form, if the contractor submits the paperwork for you, and the Strata or Co-op Consent Form.

2. The final application is by email too. Once the plan is complete and the invoice is paid, you send FortisBC the plan, the EV Ready Plan workbook, the paid invoice broken down by activity, and the mailing address for the rebate.

3. The rebate arrives as a cheque. FortisBC reviews the application and emails a decision within 90 days. Approved rebates are mailed as a cheque to the address in the application, so use a mailing address the council can collect from.

4. Your questions go to a different inbox. FortisBC's rebate line is 1-866-436-7847 and [email protected]. BC Hydro's contact does not handle FortisBC files.

Whichever utility you use, do not sign a plan contract and start work expecting to be refunded later. Pre-approval has to be in hand first.

Local top-ups: which cities add to the rebate?

Some local governments add their own money to the provincial rebate for existing buildings. These are limited-time offers, paid first come first served while the city's funding lasts, and the building must be inside the city's boundary. As of September 2026:

City EV Ready Plan Infrastructure Chargers How it works
Kelowna (FortisBC) up to $1,000 extra up to $200 extra per stall, to $10,000 a project up to $2,000 extra per charger, to $6,000 a project Listed by FortisBC alongside the provincial rebate
Kamloops (BC Hydro) up to $1,000 extra up to $100 extra per stall up to $1,000 extra Added by BC Hydro; no separate application
Saanich (BC Hydro) up to $1,000 extra up to $100 extra per stall not listed Added by BC Hydro; no separate application
Squamish (BC Hydro) up to $1,000 extra up to $100 extra per stall up to $1,000 extra Added by BC Hydro; no separate application
Nanaimo up to $1,000 $100 per parking space not listed for buildings The City's own program, with its own application; check the City's page for current availability

In Kamloops, Saanich and Squamish, the top-up brings the plan rebate to 100% of the cost, up to $4,000 in total. Whistler's local charger top-ups have been fully allocated.

We did not find an EV Ready Plan top-up in other BC municipalities as of September 2026, but programs open and close. Before relying on one, check the city's website and the utility's rebate page (BC Hydro's top-up list or FortisBC's program page) for the current figure.

A note on timing and funding

The provincial rebates and the local top-ups are both available while funding lasts. The provincial program has changed its rules several times, most recently on July 15, 2026, when pre-approval became mandatory for the EV Ready Plan rebate. If your council is considering a plan, the safe order is: get the quote, confirm your utility and any city top-up, apply for pre-approval, and only then sign and start.

A plan does not commit your strata to installing anything

An EV Ready Plan sets out how the building could provide EV charging to every unit, with a recommended solution and a cost estimate. It gives the council and owners something concrete to decide on. Whether and when to install anything remains the strata's decision.

How CF Electrical Services can help

CF Electrical Services prepares EV Ready Plans for BC strata corporations in both BC Hydro and FortisBC territory, with rebate management and support from pre-approval through the final application. We confirm which utility serves your building at the start, check whether a local top-up applies, and prepare the application for the right program. Many stratas add an EV Ready Plan to their Electrical Planning Report, so the rebate can offset the cost of the plan.

To ask about your building, get in touch, call 778-910-4772, or email [email protected].

Sources

Next steps for Fraser Valley councils

When your council is ready to act, CF Electrical Services prepares Electrical Planning Reports and EV Ready Plans for stratas across Fraser Valley — everything written in plain language for the council and owners who have to use it. When the plan becomes a project, we can manage that too.

See all Fraser Valley strata services, or browse the full guide library.

Written by CF Electrical Services — BC strata electrical consulting: Electrical Planning Reports, EV Ready Plans, and electrification project management. Published September 21, 2026.

EV Ready Plan Rebates for FortisBC Customers, and the Local Top-Ups Worth Checking — Fraser Valley FAQs

What is the EPR deadline for Fraser Valley stratas?

Strata corporations across Fraser Valley of five or more lots must have a current Electrical Planning Report by December 31, 2026 under the Strata Property Act.

Can a strata served by FortisBC get the EV Ready Plan rebate?

Yes. The rebate amount and eligibility rules are the same as for BC Hydro customers. The application goes to FortisBC instead of BC Hydro.

How do FortisBC customers apply for pre-approval?

By email to [email protected], with the strata's details, an accepted quote for the plan and the signed consent forms that apply, before the plan work starts.

Does my city add to the EV Ready Plan rebate?

Kelowna, Kamloops, Saanich and Squamish each offer up to $1,000 more toward an EV Ready Plan, and Nanaimo runs a similar program of its own. These offers are limited-time and first come first served, so confirm current availability first.

Which account number does the rebate application use?

The one on the building's common-area electricity bill. For FortisBC, it is at the top left of the first page of the bill.

How is the rebate paid to a FortisBC customer?

FortisBC mails a cheque to the address in the application, after emailing a decision within 90 days of the final application.

Request a proposal

Get your fixed-price proposal — Fraser Valley

Sent the same business day. For strata council members and property managers.

Eight details is all it takes

  • Your name, email and phone number
  • Your role on the strata (council or manager)
  • The service you are interested in
  • Strata plan number
  • Property address and postal code

Have the strata plan, unit count or drawings handy? Add the unit count with the request and the rest after you send it — optional, never required.

Your information is used only to prepare your proposal — no spam, no resale.

Prefer to talk first? Call 778-910-4772 or email [email protected].

Your details are never shared. We reply the same business day.